Site C dam project design has been changed to eliminate a separate bridge across the Peace River

Site C dam project design has been changed to eliminate a separate bridge across the Peace River

Permits approved for Site C hydro dam

BC Hydro negotiating compensation with aboriginal communities, B.C. cabinet to decide soon whether $8 billion project will go ahead

VICTORIA – Both the federal and provincial governments have issued environmental assessment certificates for BC Hydro’s Site C dam, the proposed third hydroelectric project on the Peace River in northeastern B.C.

The approvals include dozens of legally binding conditions, including a $20 million farmland enhancement fund to offset river bottom land that would be flooded, and compensation for local aboriginal groups whose historic treaty rights to hunting, fishing and trapping would be affected.

Cost of the project, last estimated by BC Hydro at $7.9 billion, will factor into a final decision by the B.C. cabinet whether to go ahead with the dam. Energy Minister Bill Bennett has indicated he expects the final investment decision to be made by the end of 2014, and if it’s approved, work would begin immediately.

Among the 77 B.C. conditions is an aboriginal business participation strategy to share the estimated 10,000 person-years of construction work the dam project would generate.

Seven aboriginal communities affected by the proposal have been offered cash and Crown land to compensate for land lost by construction of the dam. All are signatories to Treaty 8, which ensures their rights to hunt, trap and fish as they did before the treaty was signed in 1899. Officials say five of the seven are currently in negotiations.

Situated near Fort St. John and downstream of the W.A.C. Bennett and Peace Canyon dams, Site C’s 1,050-metre-long earthfill dam would create a reservoir 83 km long and two to three times the current width of the river.

It requires two power lines built in the same corridor as the existing line, and six water turbine generators that would produce enough electricity to power about 450,000 homes.

BC Hydro estimates that because Site C would use water held back in the existing Williston Lake reservoir, it would generate 35 per cent of the energy as the Bennett dam with only five per cent of the reservoir area.

 

Just Posted

Chilliwack Fire Department on scene at a house fire on Boundary Road and No. 4 Road on Thursday, June 17, 2021. (David Seltenrich/ Facebook)
Fire crews respond to house fire on border of Chilliwack and Abbotsford

Flames, dark smoke reported coming from front of house when crews arrived

Brandon Hobbs (turquoise shirt), brother of missing Abbotsford man Adam Hobbs, gathers with other family and friends to distribute posters in Chilliwack on Thursday, June 17, 2021. (Jenna Hauck/ Chilliwack Progress)
Search efforts expand to Chilliwack and beyond for missing Abbotsford man

Family, friends put up posters in Chilliwack, Agassiz, Hope for missing 22-year-old Adam Hobbs

AHL president and CEO Scott Howson believes the new Abbotsford franchise is off to a strong early start. (AHL photo)
AHL president: ‘Tremendous success’ selling season ticket deposits for Abbotsford franchise

President and CEO Scott Howson optimistic about new Vancouver Canucks affiliate in Abbotsford

Stock photo by LEEROY Agency from Pixabay
Drop-in vaccination clinics slated in Abbotsford for construction workers

Among three sites in Lower Mainland holding no-appointment clinics in June and July

A CH-149 Cormorant from 442 Transport and Rescue Squadron out of CFB Comox on a training exercise in Chilliwack on June 16, 2021. (William Snow photo)
VIDEO: Military search and rescue training in Chilliwack Wednesday

CH-149 Cormorant and CC-115 Buffalo from CFB Comox participated in downed aircraft rescue simulation

People line up to get their COVID-19 vaccine at a vaccination centre, Thursday, June 10, 2021 in Montreal. THE CANADIAN PRESS/Ryan Remiorz
Vaccines, low COVID case counts increase Father’s Day hope, but risk is still there

Expert says people will have to do their own risk calculus before popping in on Papa

Helen Austin performing with Trent Freeman at the 2018 Vancouver Island MusicFest. Austin is one of the many performers listed for the 2021 event.
Vancouver Island MusicFest goes virtual for 2021

Black Press to stream 25 hours of programming July 9-11

FILE – A science class at L.A. Matheson Secondary in Surrey, B.C. on March 12, 2021. (Lauren Collins/Surrey Now Leader)
Teachers’ union wants more COVID transmission data as B.C. prepares for back-to-school

BCTF says that details will be important as province works on plan for September

Provincial health officer Dr. Bonnie Henry outlines B.C.’s COVID-19 restart plan, May 25, 2021, including larger gatherings and a possible easing of mandatory masks on July 1. (B.C. government photo)
B.C. records 120 new COVID-19 cases, second vaccines accelerating

Lower Pfizer deliveries for early July, Moderna shipments up

A Heffley Creek peacock caught not one - but two - lifts on a logging truck this month. (Photo submitted)
Heffley Creek-area peacock hops logging trucks in search of love

Peacock hitched two lifts in the past month

The Calgary skyline is seen on Friday, Sept. 15, 2017. THE CANADIAN PRESS/Jeff McIntosh
2 deaths from COVID-19 Delta variant in Alberta, 1 patient was fully immunized

Kerry Williamson with Alberta Health Services says the patients likely acquired the virus in the hospital

The first suspension bridge is the tallest in Canada, with a second suspension bridge just below it. The two are connected by a trail that’s just over 1 km. (Claire Palmer photo)
PHOTOS: The highest suspension bridges in Canada just opened in B.C.

The Skybridge in Golden allows visitors to take in views standing at 130 and 80 metres

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

BC Green Party leader and Cowichan Valley MLA Sonia Furstenau introduced a petition to the provincial legislature on Thursday calling for the end of old-growth logging in the province. (File photo)
BC Green leader Furstenau introduces old-growth logging petition

Party calls for the end of old-growth logging as protests in Fairy Creek continue

Most Read