The B.C. government wants to replace the four-lane George Massey Tunnel with an eight-lane tunnel with two dedicated transit lanes. (Black Press Media)

Business case for Massey Tunnel replacement expected by fall: transportation ministry

Eight-lane immersed tunnel remains the preferred options

The business case for the crossing to replace the George Massey Tunnel is expected this fall, according to the transportation ministry.

It has been more than a decade since planning began to replace the 61-year-old tunnel which connects Richmond to Delta and in pre-pandemic times carried more than 80,000 people each day.

Metro Vancouver’s board of directors endorsed an eight-lane immersed tube tunnel to replace the current structure in November, a 180 from the previous 10-lane bridge wanted by the former Liberal government. The environmental assessment for the new tunnel is expected to take three years, with construction to take another five.

The immersed tube option is expected to be a “comparable order of magnitude cost” to the 10-lane bridge, which was estimated at $3.5 billion. The chosen option was one of six bridge and tunnel choices presented to regional officials.

READ MORE: Metro Vancouver debates options on Massey crossing recommendation

In a statement, the transportation ministry said the plan remained on track and the new crossing was not expected to have tolls, which the NDP government removed from all bridges shortly after coming into office.

“It’s our goal to confirm the preferred solution and complete the business case by this fall,” the ministry said. The planned tunnel would have eight lanes, two of which would be earmarked for traffic and incorporate active transportation, like cycling.

The current Massey Tunnel has an approximately 50-year lifespan, transportation ministry staff said last fall, but does not meet current seismic standards. The province is currently working on safety improvements for the existing crossing, including LED lights to better illuminate the tunnel and save energy, and better drainage to prevent ice build-up and water from pooling at the entrances. The improvements are due to be completed by spring 2021.

READ MORE: Metro Vancouver board endorses 8-lane replacement for Massey Tunnel


@katslepian

katya.slepian@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

TrafficTransportation

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

More details emerge on mental health incident in Abbotsford on Sunday

APD officers assist mental health team for three hours yesterday, man sent to hospital with injury

Heritage Abbotsford seeks stories on places of ‘cultural significance’

Locations can include spiritual sites, family homes, landmarks and more

VIDEO: Abbotsford Agrifair’s Drive-Thru Safari debuts

Event draws well as families look for entertainment in COVID-19 era

Abbotsford Police respond to incident on Edgeview Place

Cul-de-sac closed for several hours after mental health situation with young man on Sunday

Fraser Valley Bandits clinch playoff spot with win

Bandits down Niagara River Lions 70-57 on Sunday, improve to 3-2

VIDEO: Otter pups learn to swim at B.C. wildlife rescue facility

Watch Critter Care’s Nathan Wagstaffe help seven young otters go for their first dip

Wildfire breaks out near Harrison Hot Springs

1.5 hectare fire is reportedly human caused

Michael Buble among 13 British Columbians to receive Order of B.C.

Ceremony will be delayed to 2021 due to COVID-19

U.S. border communities feel loss of Canadian tourists, shoppers and friends

Restrictions on non-essential travel across the Canada-U.S. border have been in place since March 2`

Rollout of COVID-19 Alert app faces criticism over accessibility

App requires users to have Apple or Android phones made in the last five years, and a relatively new operating system

Alleged impaired driver sparks small wildfire near Lytton after crash: B.C. RCMP

Good Samaritans prevented the blaze from getting out of control

B.C. First Nation adopts ‘digital twinning’ software to better manage territory

Software allows users to visualize what a mountain might look like if the trees on its slopes were logged

Most Read