Abbotsford News

New Abbotsford Community Library set to open

Hilary Russell, manager of Abbotsford libraries, poses with a bear mascot in the new library’s children section. - Neil Corbett
Hilary Russell, manager of Abbotsford libraries, poses with a bear mascot in the new library’s children section.
— image credit: Neil Corbett

A bigger, brighter, modern library awaits the public as the Abbotsford Community Library opens its doors for the first time on Monday, Nov. 26.

Built at Abbotsford Senior Secondary, as part of a $45 million school renovation, the new $4 million library replaces the downtown MSA Centennial Library, which closed its doors for the last time on Nov. 2.

“We have a lot more space for the public, and a lot of beautiful sunshine,” said Hilary Russell, the manager of Abbotsford libraries for the Fraser Valley Regional Library.

The first thing visitors will notice is the new library’s size. At 11,000 square feet, it is almost three times the size of Centennial. It is also bright with natural light, with large windows in the east-facing wall.

Russell said it has taken three weeks to get the entire collection as well as furniture and shelves through the door. Now staff is setting up, and the facility is taking shape. The collection of some 35,000 items is being organized onto shelves.

The additional space means the library can accommodate more materials, and staff has been preparing seven pallets, or 350 boxes, of new books and materials to be added to the system.

The large, open space is shared with Abbotsford Senior, and a section of the library is the “school zone,” accessible to the general public only outside of school hours.

Russell is excited about some of the new technology, which includes a book sorting system. Materials that come in through a return slot fall onto a conveyor, travel to a central sorter, and then are conveyed into one of seven bins, each designated for a specific category. After that, they can be quickly put back into circulation.

There are also two book checkouts where patrons can check out their materials by swiping library cards and books.

The entire school building is a LEED project (Leadership in Energy and Environmental Design), with features that promote water efficiency, energy conservation and use recycled or renewable materials.

For example, the heating system is a “smart” design, which will transport heat from parts of the building that are warmer to rooms which are cooler. The source of heat is geo-thermal; runoff water is put back into the aquifer rather than storm drains; and several parking spots will allow electric vehicles to be charged.

There is still work to be done, and the children’s area won’t be finished until  December. It does contain a new bear mascot, and a “name the bear” contest for kids is coming up.

Monday will offer a “soft” opening, said Russell, noting the main parking lot might not be finished by then. But an official opening will be held when the entire facility is unveiled.

We encourage an open exchange of ideas on this story's topic, but we ask you to follow our guidelines for respecting community standards. Personal attacks, inappropriate language, and off-topic comments may be removed, and comment privileges revoked, per our Terms of Use. Please see our FAQ if you have questions or concerns about using Facebook to comment.

You might like ...

Aboriginal business booming, delegates say
 
Red Kettle campaign connects community at Christmas
 
Transit investment key to Metro Vancouver future, conference hears (with VIDEO)
Mayoral candidates discuss vulnerable citizens
 
COUNCIL ROUNDUP: More youth encouraged to voice opinions on downtown
 
Local government terms going to four years
GAMBLING: When it’s no longer a game
 
Council seeks ways to fund sprinkler installation
 
Shooting on 12th Street

Community Events, October 2014

Add an Event

Read the latest eEdition

Browse the print edition page by page, including stories and ads.

Oct 31 edition online now. Browse the archives.